Hasović, Zihnija and Ćosić, Boris and Omerbegović Arapović, Adisa and Duić, Neven (2015) Impact of new power investments up to year 2020 on the energy system of Bosnia and Herzegovina. = Impact of new power investments up to year 2020 on the energy system of Bosnia and Herzegovina. Thermal science, 19 (3). pp. 771-780. ISSN 0354-9836. Vrsta rada: ["eprint_fieldopt_article_type_article" not defined]. Kvartili JCR: Q3 (2015). Točan broj autora: 4.
|
Text
Impact of new power investments up to year 2020 on the energy system of Bosnia and Herzegovina.pdf - Published Version Jezik dokumenta:English Download (249kB) | Preview |
Abstract
This paper investigates current and planned investments in new power plants in Bosnia and Herzegovina and impact of these investments on the energy sector, CO2 emission and internationally committed targets for electricity from renewable sources up to year 2020. Bosnia and Herzegovina possesses strong renewable energy potential, in particular hydro and biomass. However, the majority of energy production is conducted in outdated power plants and based on fossil fuels, resulting in environment pollution. New major investments The Stanari Thermal plant (300 MW) and the investment in Block 7 (450 MW) at the Thermal Plant Tuzla are again focused on fossil fuels. The power sector is also highly dependent on the hydrology as 54% of current capacities are based on large hydro power. In order to investigate how the energy system of Bosnia and Herzegovina will be affected by these investments and hydrology, the EnergyPLAN model was used. Based on the foreseen demand for year 2020 several power plants construction and hydrology scenarios have been modelled to cover a range of possibilities that may occur. This includes export orientation of Stanari plant, impact of wet, dry and average year, delayed construction of Tuzla Block 7, constrained construction of hydro power plants, and retirement of thermal units. It can be concluded that energy system can be significantly affected by delayed investments but in order to comply with renewables targets Bosnia and Herzegovina will need to explore the power production from other renewable energy sources as well.
Item Type: | Article (["eprint_fieldopt_article_type_article" not defined]) |
---|---|
Keywords (Croatian): | thermal plants, renewable energy, energy system, energy planning, EnergyPLAN model, CO2 emission |
Subjects: | TECHNICAL SCIENCE > Mechanical Engineering |
Divisions: | 500 Department of Energy, Power Engineering and Environment > 510 Power Engineering and Energy Management Chair |
Indexed in Web of Science: | Yes |
Indexed in Current Contents: | No |
Quartiles: | Q3 (2015) |
Citations SCOPUS: | 2 (18.09.2017.) |
Date Deposited: | 05 Apr 2016 09:44 |
Last Modified: | 18 Sep 2017 11:53 |
URI: | http://repozitorij.fsb.hr/id/eprint/5397 |
Actions (login required)
![]() |
View Item |